History

Date Author Commit Message
2026-04-25 21:18:46 61debf lisa Restructure C01: add C01-home, consolidate Critical Path under C01 Hub now links to /sd/C01/C01-home so we have room to add C02..C05 landing pages as those checkpoints come up. Critical Path moved out of the top-level sd/ into sd/C01/ with the richer 10-task example. Adds Mr Chen's SAT GitHub Projects video walk-through as a key- concept page. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-19 18:42:06 5da0e7 lisa sd: consolidate C01 pages into sd/C01/ (remove sat01); update cross-links and Hub
2026-04-19 18:26:41 3a4e7e lisa sd: fix TELOS URL (rename), embed Roadmap video via macro, colour AI-Disclosure flowchart, simplify T/V/E to table, rework Critical Path with Gantt-first + eyeball method
2026-04-19 17:40:43 8b5e15 lisa sd: add 6 key-concept explainer pages (PSM, T/V/E, Critical Path, T.E.L.O.S., Roadmap vs Gantt, AI Disclosure) + Hub links